PPCF Sawmill solar installation, Mpumalanga — photo 1

Commercial · Grid-Tied

PPCF Sawmill — 330 kWp Grid-Tied Solar

330 kWp grid-tied solar at a Mpumalanga sawmill, with Fronius inverters integrated with the on-site generator.

330 kWp  system
Grid-Tied
IBR  roof
Mpumalanga
Completed 2024

System specification

Specification

System size330 kWp
System typeGrid-Tied
Roof typeIBR
MountingDeo Solar rail-less brackets
Scope330 kWp grid-tied PV, integrated with the on-site generator
PanelsJA Solar
InverterFronius PV inverters
LocationMpumalanga
Completed2024
SectorCommercial

Project

The site

Commercial grid-tied project in Mpumalanga, completed in 2024 on an IBR roof.

Solution

What was installed

A 330 kWp grid-tied installation at a sawmill facility in Mpumalanga, designed to offset significant daytime power costs. The Fronius PV inverters were integrated with the on-site generator, drastically reducing fuel consumption during Eskom outages while maintaining continuous production.

At a glance

Key facts

  • Mounted on Deo Solar rail-less brackets
  • 330 kWp grid-tied system on an IBR roof
  • JA Solar panels with Fronius PV inverters
  • Completed in 2024, Mpumalanga